- Projects EN

The following list shows selected projects since the formation of LH2 in 2005.
The know-how in the LH2 team comprises many years of experience in the fields of Health + Hospitality, Functional Planning, Process Planning and Project Moderation.
We shall gladly provide you with further information, should you deem this to be necessary.

[CH] Central Hospital Biel

PROJECT:

Concept Design New Building Project to Sketch Design Plus

SERVICES:

Development and overall management of global design.
Functional Design.
Architectural design concept and layout.

INVESTMENT:

approx. 350 mio CHF

TIME FRAME:

2018 – 2020

[CH] Hospital Cluster Lengg, Zürich

PROJECT:

Support Mandate of the Test Planning Project

SERVICES:

Development of project framework criteria.
Elaboration of specification / tendering.
Moderation of the workshops.

INVESTMENT:

200’000 CHF

TIME FRAME:

2019 – 2021

[CH] Central Hospital Biel

PROJECT:

Feasibility Study, Project neoSZB

SERVICES:

Realisation of the entire feasibility study.
Functional program, business plan, requirement analysis.
Layout studies, functional modell, cost estimate.

INVESTMENT:

approx. 200’000 CHF

TIME FRAME:

01-06 / 2018

[CH] Central Hospital Biel

PROJECT:

Total Refurbishment Central Hospital Biel

SERVICES:

Management of the total refurbishment of the Central Hospital Biel.
Realisation of the project until submission to the authorities.
Restructuring of all care and outpatient departments.
Functional design (care / outpatient departments).
Operational concepts, layout studies,
planning until / including sketch design phase.

INVESTMENT:

approx. 120 mio CHF

TIME FRAME:

09/2016 – 10/2017

[CH] Universiy Hospital Basel, Clinic 2

PROJECT:

Building Efficiency Analysis

SERVICES:

Trend assessment of Building Efficiency.
Funktional Analysis with the IT-tool ‘ProBAU’.
Comparison of the current project concept
with the existing functional design.
Layout studies focussing upon operational efficiency.

INVESTMENT:

approx. 900 mio CHF

TIME FRAME:

2016 – 2017

[CH] Assessment of the Dynamic Mobily Status in Acute Care (diverse locations)

PROJECT:

Analysis of Patient Condition Status in Acute Care

SERVICES:

Visuatisation of correlations between
mobility status <> level of nursing care.
Multi-parameter analysis based upon
several, daily data procurements.

TIME FRAME:

2014 – 2017

[CH] Grey Performance Analysis in Acute Care (diverse locations)

PROJECT:

Analysis of the Work Environment in Acute Care

SERVICES:

Analysis of relations between
work flow processes <> building structure.
Visualisation of problematic ‘process-detours’.
Improvement potential in relation to
existing building structures.

TIME FRAME:

2014 – 2017

[CH] Lindenhof Group, Bern

PROJECT:

Masterplan Overall Development

SERVICES:

Embrace-Plan, functional concept.
Functional analysis with the IT-tool ‘ProBAU’.
Functional-spatial program.
Medical concept, business plan.

INVESTMENT:

approx. 450 mio CHF

TIME FRAME:

2014-2015

[CH] Clinic Sonnenhof, Bern

PROJECT:

Extention Design of the Operating Department

SERVICES:

Funktional-spatial program.
Functional analysis with the IT-tool ‘ProBAU’.
Layout studies, operational flow studies.

INVESTMENT:

approx. 12 mio CHF

TIME FRAME:

2014-2015

[CH] Elderly Care Centre, Weissenau, Interlaken

PROJECT:

Functional Replanning of the New Construction Project

SERVICES:

Functional analysis with the IT-tool ‘ProBAU’.
Cost-benefit assessemnt of the adaptations.
Layout adaptations for the new construction project.

INVESTMENT:

approx. 10 mio CHF

TIME FRAME:

2011

[CH] Citizens’ Hospital Solothurn

PROJECT:

Architectural competition, 2. prize

SERVICES:

Functional and layout development.
in partnership with ARCASS architects.

INVESTMENT:

approx. 450 mio CHF

TIME FRAME:

2007

[A] Otto Wagner Hospital, Vienna

PROJECT:

Conversion of a Historic Hospital to a Health + Hospitality Destination

SERVICES:

Development of project frame and project goals.
Business model together with INSEAD Business School.
Layout and development concept.

INVESTMENT:

approx. 20 mio CHF

TIME FRAME:

2009

[FRG] Project Hohenbaden, Bad Dürrheim

PROJECT:

Health + Hospitality Concept “MOBISANUM”

SERVICES:

Master plan, functional-spatial program.
Medical / hospitality concept and business plan.
Functional layout and floor plan studies.

INVESTMENT:

approx. 45 mio CHF

TIME FRAME:

2014-2017p

[FRG] St. Martinus Stift, Elderly Care Centre, Elten

PROJECT:

Refurbishment and Building Optimisation

SERVICES:

Layout planning.
Medical concept and ergonomic care design.
Floor plan development including sketch design phase.

INVESTMENT:

approx. 3 mio CHF

TIME FRAME:

2013-2014

[FRG] Threee Elderly Care Centres Rosengarten / Kastanienhof, Berlin

PROJECT:

Refurbishment and Building Optimisation

SERVICES:

Feasibility study.
Medical concept and ergonomic care design.

INVESTMENT:

approx. 13 mio CHF

TIME FRAME:

2011-2012

[FRG] St. Elisabeth Hospital, Ravensburg

PROJECT:

Architectural competition, 1. prize

SERVICES:

Functional and layout development.
in partnership with ARCASS architects.

INVESTMENT:

approx. 300 mio CHF

TIME FRAME:

2007

[NL] Utrecht Medical Centre (UMC), Utrecht

PROJECT:

Comparative study of Operating-Theatre-Airflow Systems

SERVICES:

Scientific study of system comparisons of
existing and new clean room air systems.
Comparison of on site installations by process audits
and verification measurements.

INVESTMENT:

approx. 80 mio CHF

TIME FRAME:

2011-2012

[NL] Amphia Ziekenhuis, Breda

PROJECT:

Strategic Development of the Operating Department

SERVICES:

Conceptual study for an oparating department adaptation.
Efficiency analysis and operational scenarios.
Refurbishment concept für the OT-ventilation system.

INVESTMENT:

approx. 5 mio CHF

TIME FRAME:

2009-2010

[NL] Rode Kruis Ziekenhuis, Beverwijk

PROJECT:

Embrace-Plan for the New Construction Project of the Hospital

SERVICES:

Extended master plan > Embrace-Plan, concept study 1:200
Functional-spatial program.
Functional layout.
Business model / grey performance analysis.

INVESTMENT:

approx. 160 mio CHF

ZEITRAUM:

2007-2008

[C] Tianzi- Lake Health City Project, Shanghai

PROJECT:

Health & Hospitality Project

LSERVICES:

Feasibility study.
Business plan.
Exclusive advisor to the development team.

INVESTMENT:

approx. 900 mio CHF

TIME FRAME:

2011

[C] Dongtan Eco Medical Health City, Shanghai

PROJECT:

Health & Hospitality Project

SERVICES:

Feasibility study.
Business plan.
Exclusive advisor to the development team.

INVESTMENT:

approx. 1400 mio CHF

TIME FRAME:

2005-2006

REFERENCEN:

Bitte kontaktieren Sie uns hinsichtlich persönlicher Referenzen zu den einzelnen Projekten